Installation approach
Plan before equipment reaches the site.
- Choose a location with practical sky visibility and safe access for inspection.
- Separate dissimilar metals where required and use vessel-appropriate fasteners and sealing methods.
- Provide drip loops, strain relief and protected cable entry rather than relying on connector seals alone.
- Keep power conversion equipment in a dry, ventilated and serviceable enclosure.
a brand of Hongkong Starlink Group