Installation approach
Plan before equipment reaches the site.
- Create a pre-install survey covering terminal model, surface, cable path, power and access.
- Separate products by hardware generation to reduce connector and mounting compatibility errors.
- Use documented fastening and sealing methods appropriate to the building material and local code.
- Record installed parts and photos to improve warranty handling and future service visits.
a brand of Hongkong Starlink Group