Installation approach
Plan before equipment reaches the site.
- Pack each kit against a documented checklist and identify the supported terminal generation.
- Choose a stable location outside traffic routes with practical sky visibility and cable protection.
- Keep power connections dry, strain relieved and within the approved electrical plan.
- Train users to inspect, deploy, test and repack the same configuration consistently.
a brand of Hongkong Starlink Group